Prep levels — the bands and when each applies

Prep in Surfacely has its own production rate, in the same units as your painting rates — how much surface you prep in an hour. Pick the level that matches the condition of the surface and Surfacely works out the hours.

A slower rate means more prep. The ladder reads in the opposite direction to a percentage: Minimal is fast because there is barely anything to do, Restoration is slow because prep is the job.

PREP LEVELS — HOW FAST EACH ONE PREPS
None
no prep
Minimal
75 m²/hr (800 ft²/hr)
Light
52.5 m²/hr (565 ft²/hr)
Sound
35 m²/hr (375 ft²/hr)
Standard ★
25 m²/hr (270 ft²/hr)
Moderate
16 m²/hr (170 ft²/hr)
Heavy
10.5 m²/hr (115 ft²/hr)
Very Heavy
6.5 m²/hr (70 ft²/hr)
Extensive
4 m²/hr (43 ft²/hr)
Strip Back
2.5 m²/hr (27 ft²/hr)
Strip & Rebuild
1.5 m²/hr (16 ft²/hr)
Restoration
1 m²/hr (11 ft²/hr)

Bar length is how long the prep takes — the slower the rate, the more prep. ★ Standard is the baseline for a typical repaint. Minimal, Light and Sound are for near-new surfaces, not the norm. Prep depends on the condition of the surface alone — how fast you paint it never changes it.

Rates are shown in metric first, with the imperial equivalent in brackets:

Beyond Very Heavy, four restoration-grade bands cover the heaviest work: Extensive — 4 m²/hr (43 ft²/hr) — major repair, stripping failed areas back to substrate; Strip Back — 2.5 m²/hr (27 ft²/hr) — stripping the whole surface back; Strip & Rebuild — 1.5 m²/hr (16 ft²/hr) — stripping and rebuilding the substrate; and Restoration — 1 m²/hr (11 ft²/hr) — full heritage restoration, where prep dominates the job.

How it applies

Prep hours are the surface area divided by the prep rate. That is the whole calculation:

prep hours = area ÷ prep rate

So a 100 m² (1,076 ft²) wall at Standard prep — 25 m²/hr, or 270 ft²/hr — is about 4 prep hours. Painting it two coats at Steady (15 m²/hr, or 160 ft²/hr) is about 13 hours more. About 17 hours in all, shown in the quote as painting plus prep, priced at your labour sell rate.

Painting speed doesn't change prep

Prep depends on the condition of the surface and nothing else. Spraying a wall doesn't sand it, and a big open wall in poor shape needs the same prep as a small one in the same state — so changing the speed step, or switching to spray, leaves the prep hours exactly where they were.

Each surface type does start on the rung that suits it, though. A door starts slower than a wall, because a door in ordinary condition genuinely takes longer per m² to prep than a wall in ordinary condition. That is why the rung name on a door can read heavier than you would expect for a surface in normal shape — the rate is the thing to read, not the word.

Prep is charged once, not once per coat

You wash, sand and fill a wall before the first coat, and you do not do it again before the second. Because prep is now its own rate rather than a percentage of painting time, that is exactly how it prices: the same wall in the same condition costs the same prep at one coat, two coats or three. Only the painting hours move with the coat count.

Masking is prep

Choosing spray doesn't change the prep level. If spraying means a lot of masking, that is prep — pick a slower prep level to allow for it.

Setting your own rates

The ladder ships calibrated to the industry floor, and the slow end is deliberate — prep really is 30–50% of total labour on a normal repaint, and more on a weathered exterior. If your crew consistently beats or misses a band, you can set your own rate for any level in Settings → Company Pricing → Preparation. Clearing a value restores the system default.

Why it matters: painters who use a flat "prep included" assumption either under-charge on heavy repaints or over-charge on good-condition walls. Per-surface prep gives you per-surface accuracy — which is what wins competitive quotes on easy work and protects you on hard work.
Tip: a rate is something you can check against your own experience in a way a percentage never was. "Standard prep is 25 m²/hr" is a claim you can accept or reject after a morning on the tools. Time yourself on one wall and compare.